Commit a cost to accounts
This guide explains how to commit a cost in a Collaboration Hub project to the accounts that pay for it. You can assign a whole cost to one account, or split it across several. Commit a cost when it’s final.
|
What you see here depends on your workspace’s configuration. Your workspace settings control which accounts you can commit a cost to. If an account you need isn’t available, contact your administrator. |
Prerequisites
Before you begin, ensure you have:
-
Access to the project, through a group set up by your administrator.
-
The owner or editor role on the project. To assign project roles, use Manage project collaborators.
-
A cost on the project that isn’t committed yet. To create one, use Add a cost.
Commit a cost to one account
Commit a cost to one account when that account pays all of it.
-
Select Content Portal from the app switcher in the left navigation.
-
Select Collaborate, then select the All Projects tab.
-
Select a project.
-
Expand Finance in the project’s menu, then select the Costs tab.
-
Open the cost’s menu and select Commit.
The Commit Cost modal opens with one allocation.
-
Select an Account.
The list only includes accounts that use the cost’s currency and fiscal type.
-
Check that Value is the full value of the cost.
-
Optionally, enter a Label for the allocation. The default label is the current project’s name.
-
Check the cost’s details, then select Submit.
You can’t change or delete a cost after you commit it. The cost’s menu no longer appears, and on the cost line shows that the cost is committed.
Split a cost across several accounts
Split a cost when more than one account pays for it, for example, when two brands share a production cost.
-
On the project’s Costs tab, open the cost’s menu and select Commit.
-
Complete the first allocation:
-
Select an Account.
-
Enter the Value to assign to that account.
-
Optionally, enter a Label.
-
-
Select Add Allocation to add another allocation.
-
Complete each allocation in the same way. Each allocation can use a different account and label.
To remove an allocation, select on that allocation. A cost always needs at least one allocation, so you can’t remove the last one.
-
Check that the allocation values add up to the full value of the cost.
You can’t commit the cost until they do.
-
Select Submit.
You can’t change or delete a cost after you commit it.
View a committed cost
On each cost line, shows that the cost is committed, and shows that it has attachments.
-
On the Costs tab, select a committed cost.
The cost’s allocations display, each with its account and value, and a count of allocations.
Troubleshooting
Each of these problems is a common cause of trouble when you commit a cost. Select one to display its solution.
Problem: The account you need isn’t in the list.
Solution: the list only includes accounts that use the cost’s currency and fiscal type. Check that the cost has the right currency and fiscal type. To change the currency of a cost that isn’t committed yet, use Change a cost. You can’t change a cost’s fiscal type, so if it’s wrong, delete the cost and create a new one. If the account still isn’t in the list, contact your administrator.
Problem: You can’t commit the cost.
Solution: the allocation values must add up to exactly the full value of the cost. Adjust the values until they match, then select Submit.
Problem: The cost has no menu.
Solution: the cost is already committed. After you commit a cost, you can’t change it or commit it again.